First, my language is Spanish, and the translator of google translate it to English, so I will ask forgiveness for the faults of spelling and narrative ..

MATERIALS USED:
• Oven Door • burner door • Thermometer • 1 meter stainless steel tube • hood in stainless steel shot • Kit throw mud fireplace with stainless,

Polystyrene sheets 14
1 jar of glue for polystyrene 1 cubic meter of mixture (0, 1 and 2) to make concrete 8 bags of gravel Number 2 Rods for concrete 14 bloquillos of 50x20x20 Reflectarios 310 bricks 12 standard cement bags 14 bags of cement reflectario Two bags argila (expanded clay) Sal (where needed) Crystals (recycling) 1 bloquillo 20x20x20 Fiberglass wool Rack fiberglass wool Wired to hold the wool 2 sacks mortar waterproof 7 square meters of stone 1 door aluminum 60x40 3 square meters of white tile and some loose color. Flashings for tile, 3 bags of 3 kilos Dish planter for cap

There are many tips on the construction of the dome, with a cord with radio Dome, with the guidance of a knot, which I found very interesting, although placing bricks above is very difficult, for the nonsense that "the law of gravity" and to have little experience in the field of masonry, so I decided to make a mold with extruded polystyrene plates, of 125x60x05 cm. I bought a package, which came 13 units, using virtually all, ah, I bought also a pot of glue for polystyrene. (polystyrene € 1.95 unit, glue about 6 €).

P1020668 [800x600].jpg

1º- To make the dome.
I put together two sheets and a nail and a rope, draw a radius of 45cm, then with a jigsaw with a saw for clean cuts (one that is small and thin), we cut the halves of the circle, then with the I hit the glue

P1020670.JPG
P1020671 [800x600].jpg
P1020672 [800x600].jpg
P1020673 [800x600].jpg
P1020674 [800x600].jpg
P1020675.JPG
P1020676 [800x600].jpg
P1020677 [800x600].jpg
P1020678 [800x600].jpg

2.- with a sheet of very thin wood, I made a template of a quarter of the circumference, then just as,
I scored 4 in polystyrene plates and cut.

I have cut with a radius of 40 cm, (note, I did not complete curvature, and that from the base allow about 15 cms (three blocks) straight, then continue the curvature) because if the cut 45 could only put two together, the other two come out the edges 5 cm, with the following photos will understand

Subsequently I have been cutting plates with the same dimensions, although I have been adjusted according to the depth of the dome, placing pieces, until I no longer fit more

P1020808 [800x600].jpg
P1020809.JPG
P1020810 [800x600].jpg

The gaps filled them with newspaper, then use foam
polyurethane, and with a very sharp knife removed the excess, and so I ended mold dome

The oven I've done, I've built with burner, thus following
the above procedure, I made a template, and cut several pieces, and the remains of the cuts was sticking up having mold inside thereof. (NOTE: mold burner was using measurements reflectarlo brick 22x11x5, RENOTA: when buying these bricks were of 20x10x5, RERENOTA: Well I did another template, but with conglomerate .... That will be it has to do ... Upon the molds, I've gotten several things, with the dome, the oven floor does not get dirty while we put the bricks, Laying Bricks around was easy and quick, and disposal mold was simple.

P1020803 [800x600].jpg
P1020807.JPG
P1020811 [800x600].jpg
P1020813.JPG
P1020815 [800x600].jpg
P1020818 [800x600].jpg

Leveraging an earthen pit had, empty land, to reach the
hard earth. The hole measures 140 x 120 cm Then I filled it with 8 sacks of gravel # 2

Then I have to thank uncivilized neighbor, who left with the dumpsters, which would be the cutting of a closet, and picked it up, (have to use it all), I did the formwork, about 25 cm high

Taking advantage of galvanized steel tubes, which had no use, I made the rack then pour the concrete.

P1020820.JPG
P1020821 [800x600].jpg
P1020824 [800x600].jpg

Two days lift the first row of blocks, to the base of the burner

P1020825 [800x600].jpg
P1020826 [800x600].jpg
P1020827 [800x600].jpg
P1020830 [800x600].jpg
P1020829 [800x600].jpg

I prepared the base, bobadillas, wood for formwork and concrete grid ....
I placed the pan from the oven, which have positioned and dialed .... Thus it is possible to match the burner oven., at the back

P1020833 [800x600].jpg
P1020835 [800x600].jpg
P1020836 [800x600].jpg

I laid the basis for the burner, and filled the joints ....

P1020838 [800x600].jpg
P1020839 [800x600].jpg
P1020840 [800x600].jpg
P1020841 [800x600].jpg
P1020842 [800x600].jpg
P1020843 [800x600].jpg
P1020844 [800x600].jpg
P1020845.JPG

I focused pan from the burner and put the bricks around ...

P1020846 [800x600].jpg
P1020847 [800x600].jpg
P1020849 [800x600].jpg
P1020850 [800x600].jpg
P1020851 [800x600].jpg

I placed under the burner ...
The pins to anchor the door should be lifted, bend and rotate with pliers or tongs, and then make a recess in the brick so that it introduced ....

I cut foam core, of the same dimensions as the interior of doorframe burner, which served me as a support bricks placed on top ...

P1020852 [800x600].jpg
P1020853 [800x600].jpg
P1020854 [800x600].jpg
P1020855 [800x600].jpg

Then lift two rows of blocks to fill around the burner

P1020856 [800x600].jpg
P1020857 [800x600].jpg
P1020858 [800x600].jpg
P1020859 [800x600].jpg

With expanded, some sand and refractory cement argila, made concrete
I filled the base around the stove, getting lighter weight plus be an excellent heat insulation

P1020862 [800x600].jpg
P1020863 [800x600].jpg

I made a wooden box measures fireplace burner

P1020864 [800x600].jpg
P1020865 [800x600].jpg
P1020868 [800x600].jpg

I prepared the formwork for the oven, with the corresponding grid,
and I filled concrete

P1020867 [800x600].jpg
P1020870 [800x600].jpg
P1020872 [800x600].jpg
P1020873 [800x600].jpg

To split bricks in half, I dialed the radial, then
supported upside down on a wood with a small blow of mace, are parties.

P1020874 [800x600].jpg
P1020875 [800x600].jpg
P1020876 [800x600].jpg

In the concrete base, I placed the pan from the oven, I focused to suit
off the burner, and placed bricks until they found the initial form ...

P1020877 [800x600].jpg
P1020878 [800x600].jpg
P1020879 [800x600].jpg
P1020880 [800x600].jpg
P1020881 [800x600].jpg
P1020882 [800x600].jpg
P1020883 [800x600].jpg
P1020884 [800x600].jpg

Then I filled the inside with salt on the glass and then put the bricks to the furnace base, the
I placed bricks on salt, just go over it, without any cement, going over the edge, I placed with refractory cement. I left joints between the bricks, then stuffed with refractory.

P1020885 [800x600].jpg
P1020886 [800x600].jpg
P1020887 [800x600].jpg
P1020888 [800x600].jpg
P1020889 [800x600].jpg
P1020890 [800x600].jpg
P1020891 [800x600].jpg
P1020892 [800x600].jpg
P1020893 [800x600].jpg
P1020894 [800x600].jpg
P1020895 [800x600].jpg
P1020896 [800x600].jpg
P1020897 [800x600].jpg
P1020898 [800x600].jpg
P1020899 [800x600].jpg

Then I put the pan from the oven, place the door thereof, and
I started laying the bricks around, building mold, placement is faster and easier than if we do it with a rope guiding with knots.

P1020900 [800x600].jpg
P1020901 [800x600].jpg
P1020902 [800x600].jpg

Here you can see the rear, with the rear door template is which holds the bricks while the cement dries

Here the copper tube placement is observed for the pyrometer

P1020903 [800x600].jpg
P1020905 [800x600].jpg
P1020906 [800x600].jpg
P1020907 [800x600].jpg
P1020908 [800x600].jpg
P1020909 [800x600].jpg
P1020910 [800x600].jpg

Must leave the gap between the rear door and the mold, for a chimney placement

P1020917 [800x600].jpg
P1020918 [800x600].jpg
P1020919 [800x600].jpg
P1020920 [800x600].jpg

We ended up putting the last brick, brick fireplace adjusting,
to be completely covered, then I gave a layer of mortar reflectario entire dome

P1020921 [800x600].jpg
P1020926 [800x600].jpg

Then I placed the chimney draft, and around a square bloquillo, Cutting the front in two halves, for enjacar shot of the same

P1020928 [800x600].jpg
P1020929 [800x600].jpg
P1020930 [800x600].jpg
P1020931 [800x600].jpg

after I gave a good coat of cement reflectario all around

P1020932 [800x600].jpg
P1020933 [800x600].jpg
P1020934 [800x600].jpg
P1020935 [800x600].jpg
P1020936 [800x600].jpg
P1020937 [800x600].jpg
P1020938 [800x600].jpg
P1020939 [800x600].jpg

Once the mortar has dried, at its base made holes with a drill
of a size smaller than I placed screws, which are the cables will be subjected to the fiberglass wool I installed to further isolate oven.

Once placed glass wool, I placed a metal mesh, which is the grip that will serve the reflective layer mortar is given subsequently., All secured with wire

P1020940 [800x600].jpg
P1020941 [800x600].jpg
P1020942 [800x600].jpg
P1020943 [800x600].jpg
P1020945 [800x600].jpg
P1020949.JPG

When it is secure, you are given a coat of mortar reflectario

P1030192.JPG
P1030193.JPG
P1030194.JPG
P1030197.JPG
P1030201.JPG

Then as I bought two bags of white waterproof mortar, the use and gave three layers, then at the bottom I lined the walls with stones
I bought a 50x60 aluminum door, and placed in the lower hole

I filled the joints of the stones and install the oven doors and burner

P1030203.JPG
P1030205.JPG
P1030206.JPG

The next step was to line the oven with pieces of white tile, with a touch of color

P1030207.JPG

I bought a stainless steel tube and head, but as I do not want to leave fixed, grabbed a plate of a planter and also covered it with pieces of tile, to place it on the base of the chimney to keep out the water.

P1030211.JPG
P1030212.JPG
P1030214.JPG
P1030216.JPG

I filled the gaps between the pieces-tiled with flashing red

P1030219.JPG
P1030220.JPG
P1030223.JPG
P1030221.JPG
P1030222.JPG

And as a final point, because clean everything, tiles, stone, doors, flooring ... ..
When not in use the cap on the vent is placed,. when you are going to use a stainless steel stand with a swivel head

Greetings from the island of Mallorca, Spain
matthew.