Outdoor Pizza Oven

by rower-11 in Outside > Backyard

34770 Views, 343 Favorites, 0 Comments

Outdoor Pizza Oven

20190805_131111.jpg
20190515_154538.jpg
20190526_221138.jpg

I have always wanted to build a pizza oven, and I finally did. I have no prior experience in making pizza ovens or working with cement, so there was a lot of learning during this process.

I started by making a rough draft of pizza ovens shapes and designs and decided on the semi barrel shape.

Supplies

OVEN:

Cement (A lot) : Regular for the base and counter, Portland for the oven mold

Perlite

Stainless Steel Needles

Firebricks

Refractory Mortar

Ceramic Insulating Fabric

Chicken Wire

Bricks

5" Stainless Steel Pipe

MOLD:

Hardboard

Plastic Light Cover (or other flexible material)

Lumber

Plastic Poly Sheet

Foundation

20190515_154526.jpg
20190516_115213.jpg
20190516_115216.jpg
20190516_121436.jpg
20190516_121444.jpg
20190518_092659.jpg
20190518_092705.jpg
20190518_092711.jpg
20190525_083619.jpg
20190525_083634.jpg

I chose a flat location, and made a 5' x 4' mold for the base of the oven out of plywood. I lined the bottom of the mold with hardboard, so the cement I poured would not bond with the patio. I filled the mold with about 2.5" of cement.

Bricks and Base

20190526_162553.jpg
20190526_162537.jpg
20190526_193331.jpg
20190526_193336.jpg
20190526_193348.jpg
20190527_160257.jpg
20190527_160250.jpg
20190527_201052.jpg

Once the base had dried I got some bricks and arranged them in a pattern I liked, then fixed them in place. Each brick is 4" tall, and there are 7 layers so the height is around 28".

Counter

20190528_122726.jpg
20190528_123833.jpg
20190528_141035.jpg
20190528_141048.jpg
20190528_142804.jpg
20190528_144419.jpg
20190529_085508.jpg
20190601_124051.jpg
20190601_151445.jpg
20190602_082807.jpg

I made a mold 5'3" x 4' x 2" for the counter to allow for 1.5" of overhang on either side. I placed the mold in my garage (as it has a nice flat surface), and lined the ground with a poly plastic sheet. The mold was filled about halfway up, then a metal grid was added for additional support, before filling the mold. The mold was allowed to dry for a week before being added on top of the brick structure.

Making the Molds

20190528_152029.jpg
20190528_152020.jpg
20190528_163632.jpg
20190528_163624.jpg
20190528_163620.jpg
20190528_163636.jpg
20190618_142455.jpg
20190625_111709.jpg
20190625_111715.jpg
20190625_111548.jpg
20190625_111606.jpg
20190625_111611.jpg
20190705_095958.jpg
20190630_160335.jpg
20190727_085609.jpg

I made a mold for the fire chamber with plywood and hardboard. There were 4 parts to the mold: Entry, Main Chamber, Front and, Back.

Entry

The entry mold was made out of plywood and plastic light covers. It was 11.5" long x 24" wide (20" opening plus 2" on either side to account for wall width). The width of the walls was 2". The plastic used to create the walls of the entry was 38" x 11.5" to create a height of 12" (semi-circular shape). Although I used the plastic light covers to make the curved roof of the entry, this material was very brittle and I would suggest using something else. I made an aluminum foil "doughnut" covered in clear tape to create a space where the chimney would go.

Main Chamber

The main chamber mold was made out of plywood and hardboard. It was 33" long x 54" wide (50" plus 2" on either side to account for wall width). The width of the walls was 2". The hardboard piece used was 85" x 33" to create a barrel height of 27" (semi-circular shape).

Front

The front mold was made after the main chamber mold had dried and based off of it. It was made to sit inside the main chamber. It had an opening the same size as the opening on the entry mold. It was made of a plywood base, with a hardboard curve.

Back

The back mold was made after the main chamber mold had dried and based off of it. It was made to sit inside the main chamber. It was made of a plywood base, with a hardboard curve.

Filling the Molds

20190628_162509.jpg
20190628_172058.jpg
20190630_181639.jpg
20190628_155015.jpg
20190715_113336.jpg
20190720_111840.jpg
20190720_111845.jpg
20190705_095941.jpg
20190705_105735.jpg
20190721_171925.jpg
20190721_171929.jpg
20190630_100841.jpg
20190730_092105.jpg

All of the molds were filled with ~4:1 ratio of course perlite : portland cement and some stainless steel needles.

When packing the molds it is important the the cement mixture is tightly packed, and when filling the main chamber mold the mixture will need to be packed regularly as you go.

I let the molds dry for 2 weeks.

After dry I removed the cast pieces from the molds. After being removed from the molds all pieces were covered in a thin layer of portland cement.

Firebrick Floor

20190708_155232.jpg
20190708_160009.jpg
20190708_190042.jpg

I arranged the firebricks in a pattern I liked, and that I thought would allow a pizza peel to easily slide across. I marked the edge of the oven floor on the bricks, and used one brick to fill more than one edge gap where I could. The bricks were then cut and arranged in the pattern before being attached to the surface with an insulating cement.

Oven Assembly

20190730_092048.jpg
20190730_095505.jpg
20190730_100624.jpg
20190730_095516.jpg
20190730_104853.jpg
20190730_104856.jpg
20190730_110126.jpg
20190731_134250.jpg
20190731_134301.jpg
20190731_134307.jpg
20190731_134318.jpg
20190731_134327.jpg
20190731_183034.jpg

The 4 mold parts were assembled around the oven floor and attached together with refractory mortar.

Insulating Fabric

20190801_093642.jpg
20190801_093647.jpg
20190801_120514.jpg
20190801_120520.jpg
20190801_120526.jpg
20190801_120533.jpg

A 2" ceramic insulating blanket was placed over the main chamber and back, then tightly wrapped in chicken wire.

Chimney and Finishing Up

20190804_100617.jpg
20190804_100621.jpg
20190804_100628.jpg
20190804_210852.jpg
20190804_210907.jpg
20190804_210840.jpg
20190805_083444.jpg
20190805_131322.jpg
20190805_131141.jpg
20190805_131058.jpg

The Insulating fabric was then covered in portland cement. It took 3 layers to fully cover it, and then some finishing touches after that to make it nice and smooth. To attach the chimney, a stand was made to hold the chimney up in the entry. The chimney was placed onto the stand, and the gaps around the chimney were filled with refractory mortar to secure it in place.

Test Fire

20190802_205942.jpg

I started with a small curing fire lasting only around 10mins. Two days later I did a larger fire lasting around 30mins. I then did a fire lasting around 45mins.

Pizza!

IMG_2046.jpg
IMG_2052.jpg
IMG_2044.jpg

Char is flavor

Failures

20190630_181636.jpg
20190705_095933.jpg
20190705_105737.jpg
20190707_120338.jpg
20190721_142727.jpg
20190721_142730.jpg
20190721_142734.jpg
20190725_104744.jpg
20190725_110711.jpg

As stated at the start, I am a novice when it comes to working with cement, and as such there were several things that did not go too well along the way.

The original molds for the Front, Back and Main chamber ended up being redone.

The Main chamber mold piece cracked, due to inadequate concrete packing.

The Front mold piece did not fit, because the main chamber deformed a bit in the mold.

The back mold piece broke as it was knocked over.

Thanks for Reading!