Miniature Concrete Hoover Dam

by akashv44 in Outside > Water

22507 Views, 121 Favorites, 0 Comments

Miniature Concrete Hoover Dam

IMG_6205_2.jpg

In this lesson, we'll create a little version of a working arch dam similar to the Hoover Dam. On the boundary of the American states of Nevada and Arizona, in the Black Canyon of the Colorado River, sits the Hoover Dam, a concrete arch-gravity structure.

The Hoover Dam was formerly the tallest dam in the world. In this video, you may learn how to build a dam.


Supplies

Screenshot (226).png
Screenshot (228).png
Screenshot (229).png
Screenshot (230).png
Screenshot (231).png
Screenshot (227).png

We used simple items, like these, to build this dam.

1) Steel wires

2) Sun board sheet

3) Geared Motor

4) Cement

5) Sand

6) Water

7) 3d Printer

Excavation and Foundation

1.png
2.png
3.png
4.png
5.png
6.png
7.png
8.png
9.png
10.png

For this arch dam, hilly terrain is first required. using tools to excavate a 2 foot curve similar to picture 1. Then cut cardboard in accordance with the ground you dug up and drill holes for steel wire reinforcement.

Steel wires are used in place of steel bars. Vertically insert steel bars into each hole. Place the horizontal steel bars at a distance of 1 inch after the vertical steel bars.Then use tiny wire to connect these bars.

Then Remove the cardboard reinforcement from the base.

RCC of Foundation

11.png
12.png

Utilizing cement, sand, and water, create RCC for foundation filling. After that, carefully add foundation with this mixer, and wait 24 hours for it to set.

Foundation Formwork

13.png
14.png
15.png
16.png
17.png
18.png

Then, take some steel bars, arrange horizontal stirrups as shown, and connect with thin wire.

After that, cut a sun board sheet to the formwork's size and curl it around the steel bars.

Support and RCC of Formwork

19.png
20.png
21.png
22.png
23.png
24.png

After that, support the formwork and prepare a cement and water mixer. Carefully fill this formwork with the RCC mixer. For RCC, use the Mini Vibrator to avoid bubbles.

Give the concrete another 24 hours to harden. 

Downloads

Remove Formwork

25.png
26.png
27.png

When ought formwork to be taken down? 

Concrete formwork removal, also known as strike-off or stripping of formwork, should only be done once the concrete has developed adequate strength, which is at least twice as much stress as the concrete may experience when the formworks are removed.

Remove the support first, and then carefully remove the sunbord sheet. The concrete has a beautiful polish.


Doors

28.png
29.png
30.png
31.png
32.png

Then make two motorized sliding doors sing 3d printer for the water storage's outflow. If you don't have a 3D printer, you can still create these doors by hand. Placed on this structure after being made, the doors have formwork on either side of them.

Doors RCC

33.png
34.png
35.png

Fill the concrete mixer with the formwork and allow it to set for 24 hours. Next, remove the formwork as shown in the images.

Second Formwork

36.png
37.png
38.png
39.png
40.png
41.png
42.png
43.png

Get steel bars and arrange them horizontally as in photographs after that. Next, cover both sides of the formwork with a sunbord sheet. Add a sunbord sheet road to this dam so that both cars and people can pass across it.

RCC of Road

44.png
45.png
46.png
47.png
48.png
49.png

Then make a concrete mixer and carefully fill it. To prevent bubbles on concrete, use a vibrator. Give this concrete 24 hours to set. After that, delete the formwork shown in the picture. The finished Curved dam is visible.

Downloads

Automation of Doors

50.png
51.png
52.png

We used a miniature geared motor to open and close these dam doors. Incorporate a microgeared motor into the shell and attach a wire. The screw of these sliding doors is attached to the shaft of the gear motor. Doors open and close when we turn the gear motor in a clockwise direction.

Downloads

Road Railling

53.png
54.png
55.png
56.png

For safety, install railing along this road of doors.

Working

Mini Dam Construction
57.png
58.png
59.png
60.png
61.png

It is now time to put this dam into action. Fill this dam's backside with water. Then press the door opener to let the doors of this curve dam open. You can see the water moving.

Watch the entire video for a step-by-step reference.