Cement Wall Gym Mirror Installation (Two J-Channel Method)

by djpolymath in Workshop > Home Improvement

7667 Views, 5 Favorites, 0 Comments

Cement Wall Gym Mirror Installation (Two J-Channel Method)

Cement Wall Gym Mirror Installation (Two J-Channel Method)

This video describes installing frameless gym wall mirrors in cement or cinder block walls. It utilizes a method using two J channels rather than a J channel with with top mounting clips.

Materials: 36"x60" frameless mirrors, 72" J-mold, Tapcon 3/16 x 1 1/4 anchors, Tapcon 5/32 bit, Drill (preferably hammer drill), Level, Socket Wrench

Measure Bottom

2021-01-31 19_20_25-Movies & TV.png

Measure the center bottom of the mirror placement.

Tap

2021-01-31 19_21_02-Movies & TV.png

Tap out the holes in the J-mold so the anchors will fit.

Drill Bottom

2021-01-31 19_21_33-Movies & TV.png

Drill the hole for the center of the bottom J-mold.

Fasten Bottom

2021-01-31 19_21_52-Movies & TV.png

Fasten the J mold to the wall in the center, then make sure it is level. Drill and fasten other holes.

Measure Top

2021-01-31 19_22_45-Movies & TV.png

Measure up from the bottom J-mold the height of the mirror to mark the placement of the top J-molding.

Drill Top

2021-01-31 19_23_16-Movies & TV.png

Drill top center hole.

Fasten Top

2021-01-31 19_23_58-Movies & TV.png

Fasten top in center, then check for level. Then drill and fasten other holes.

Install Right

2021-01-31 19_24_29-Movies & TV.png

Slide the right mirror in place.

Install Left

2021-01-31 19_25_04-Movies & TV.png

Slide the left mirror in place.

Reflect

20210131_155024.jpg

Reflect on the completion of installation.