COMPLETE HALF BATH RENO
by jaimesands426 in Workshop > Home Improvement
145 Views, 0 Favorites, 0 Comments
COMPLETE HALF BATH RENO
I completely gutted our upstairs half bath down to studs, and rebuilt myself. The vanity was a garbage pick that had no drawers or top, i built "barn style" doors and made a mosaic top. Features a upcycled pallet wood accent wall and upon removing the old walls I discovered the chimney, which is half brick, half cinder block. I painted faux brick to make it look uniform and left it exposed. I also vaulted the ceiling to create a larger feel in the small space. Home made tracking for the sliding door and much more custom touches.
DEMO
Removal of fixtures, walls, ceiling, old insulation and flooring.
REBUILD
Insulated walls and hung new sheetrock. Also decided at this point to leave ceiling vaulted.
ACCENTS
Painted walls and installed reclaimed pallet wood accent wall and stained and poly coated the ceiling beams and installed barn wood inlays. Installed new laminate flooring.
FINAL TOUCHES
Installed wood molding and trim boards, hung door on custom built rolling track, installed new fixtures and decor.