A Soil Cement Sectional Floor

by Wildcat Man and Robin in Workshop > Home Improvement

11335 Views, 93 Favorites, 0 Comments

A Soil Cement Sectional Floor

TheTamper.jpg
CoverYurt.jpg

I read an article about making soil cement decades ago, possibly from an issue of Mother Earth News. I thought I might want to try it someday. The wood-framed panelized yurt that we built recently was the perfect place for the experiment. The idea of a “dirt floor” seemed to go well with the setting and the unique building. Plus, I could form it in twelve sections, just as the yurt is 12-sided. There in an Instructable about the yurt, click here to view if you are curious! As usual, this Instructable is written as a "how we did it." We hope you enjoy our soil cement journey and are inspired to try it for your project!

Note that this is not the commercial soil-cement used by some highway departments, which employs sand and crushed stone with the soil and cement, making it basically concrete with soil added. They might use other waste materials as well, such as cinders and fly ash.

Supplies

Soil, Cement, Water (the amounts needed are detailed in the instructions), Vessels for storing sifted soil, Sifting Tray, Wheelbarrow for mixing, Shovel, Hoe, Small Shovel for scooping and cleaning out last bits, Strong Bucket, A variety of Concrete Trowels (i.e. margin, brick, rounded finish, long finish), Tamper, Fence Wire, Plastic Sheeting, Tape, Form Materials

Test the Mix

Test-Glop.jpg
IMG_2850.jpeg

Since I had discarded the article, saving only the “recipe,” I did a couple of tests first. The mix ratio from the recipe was different from what I settled on. The original recipe called for less cement by volume (5:1) and the amount of water was less. The calculated volume of material for one of the 2-1/2 inch thick wedges was 3 cubic feet. This proved to be inaccurate when using our soil. The loose, crumbly clay soil turned out to need four cubic feet to allow for all the air pockets. So, adjustments were made, settling on a mix of four cubic feet of soil to 1 cubic foot of cement for one wedge. We divided each wedge pour into 1/4 cubic foot of cement to each cubic foot of clay soil, making a total of four pours per wedge. The water mix would be whatever made it workable, but originally was figured to be less than two gallons.

I made two tests to see how the final floor might look. I painted one of them with concrete stain just to see how we liked that look. We didn’t. The natural color was just the look we wanted for the yurt floor.

My first test sample, a very small amount comparable to the 4:1 mix with the water equivalent to the original recipe turned out fine in the test, but proved to be way too dry in the first wedge we mixed and poured. So, the amount of water became an evolving test as we mixed and poured the subsequent wedges. Generally, two gallons per mix worked with adjustments made for damp soils or dryer soils. Even though all the soil came from one pile, the moisture content varied.

Build the Form

Forms.jpg
FormsMoving.jpg

The first step was to make forms. My plan was to pour the wedges from the back of the yurt to the front, every other one. The forms were simply screwed to the yurt deck. They could be easily moved for each subsequent pour. Once six were done and cured enough, then we’d just fill in the final six wedges. The middle was left to put in something fun for a center focal point.

The second photo shows how the pours progressed and the form material was moved.

The center was six-sided while the yurt was 12-sided. Due to this, the forms would meet at a corner point, and the center of one of the six sides, thus being different lengths and angles. I made each a little short and used wedge shims to bring them tight. This also made it easier to remove when the pour was cured.

You could use this form system to pour a square or rectangular form by deciding how large a pour you wanted to do for each section.

Bring in the Dirt

DirtPile.jpg
JarTest.JPEG

I brought in what I estimated to be more than enough sandy clay soil for the project, about 2-1/2 cubic yards. I dug it up on our property, but dirt can be found where excavation projects are going on. Just about any kind of earth can be used, as long as it contains clay and sand. It should be free of organic material and debris.

I tested my soil by filling a jar half full of sifted earth and adding an equal amount of water. I covered the jar and shook it for a few minutes then allowed it to stand undisturbed for an hour or so. Once settled, the soil will have separated into layers of sand on the bottom, clay in the middle and silt on the top. The ideal mix is when there is about 75% sand and 15-20% clay. I did several tests and got different results each time. In this photo there is about 50% sand and 50% clay and silt. I figured since this was an experiment, we'd just go for it and see what we got. As mentioned already, we made adjustments in the amount of water as we went along.

Sift It! Sift It Good!

DirtClods.jpg
CuFtMeasure.JPEG
CuFtDirt.jpg

Robin was the official sifter. She started by just chopping at the dirt with a hoe, but then figured out one of her plastic greenhouse trays would do the job and give us a more consistent product. After the first pour, we determined that each wedge would require almost 4 cubic feet of dirt. I had built a 12x12x12 inch (a cubic foot) box to measure the volumes. Robin got the four batches ready in advance of each pour by just filling the box with sifted dirt and storing in various holding containers.

Mix It Up

MixCementSoil.jpg
MixWater.jpg

The soil went into the wheelbarrow first, then the cement was added in furrows I made in the soil. I mixed that up using a hoe, chopping at it about 2 inches at a time from front to back so that the cement was well dispersed throughout the soil. Dry mixing continued until I couldn’t see any “orange” clay or “grey” cement bits.

Then I added two gallons of water and mixed until we had a batch that wasn’t soupy, but not too dry. We found that the wetter the mix, the better.

Get Down and Get Dirty

ShovelingBucket.jpg
MudBetweenWedges.jpeg
PourMud.JPEG

Since the yurt has a few steps up to it and neither of us have terrific knees, Robin filled the bucket with about three shovel scoops and hauled it up to me inside the yurt. I slopped down the glop and handed back the bucket. One wedge, which was four batches of soil cement mix, took about two hours including a break after the wire reinforcement was tamped in after the second pour.

Since we’d have four pours for one wedge, I worked from the back to the front. After two pours, I spread it all out evenly, using a brick trowel to move big blops around and a margin trowel to semi-smooth it all.

Start Spreading the Mud

PilinOn.jpg

Even though we used the same proportions of dirt, cement, and water for each pour, the consistency varied wildly. After the first couple of wedges, we decided we liked the wetter consistency and I started adjusting the amount of water depending on what happened with the mix. The wetter blend, about the consistency of Sloppy Joe mix, was easier to shovel and work with, plus those wedges were not as prone to cracking, which did happen on several early pours.

Add Wire Reinforcement

TampingWire2.jpg
CutWire.jpg
TampingWire.jpg
TheTamper-Alone.jpg

I had no idea if soil cement cracks the way concrete can, but I figured reinforcement would help by containing the separation if it did occur, holding all snug together. I made a jig to simplify cutting the reinforcement wire, cut 2x4 grid fence wire in three pieces (this made the best use of the material), positioned it carefully, then tamped it into place. It was tamped to get any high ends down and to embed it into the first layer.

I made my tamper from an approximately 8 inch piece of cedar tree trunk, a hole drilled in it to accommodate a broom handle.

Get Back to the Dirt

ReadyToMix.jpg

While I tamped, Robin loaded the next cubic foot of dirt into the mixing wheelbarrow and measured out the cement. If she had the energy, she also started sifting dirt for the next wedge. We scheduled two wedges a week, weather permitting. We got behind when wildfires in Oregon caused our air quality to become unsafe for breathing, but after a couple of weeks we were able to return to the task. We got rained out a few times as well.

Screed It!

screeding.jpg
MoreScreeding.jpg
ScreedingWedge2.jpg
ScreedingWedge.jpg

Once we poured the fourth batch into a wedge, it was time to screed. I screeded using a 1x3, just as I would for traditional concrete. The “sawing” motion while advancing the screen board forward used in working concrete didn’t work very well. When screeding the soil cement, I found that it didn’t pull along like a concrete mix does. It tended to suck the “mud” from behind, pulling it away from the forms and scraping the surface off behind. The “mud” also built up in front, making it difficult to move it forward. I worked out a method using a margin trowel to remove the material from in front without taking too much.

Finish It.

Finishing.jpg
BetweenWedge.jpg

When I got it fairly close, I used finishing trowels to begin smoothing it out. When working it you can get the surface to pull along to lower areas. Occasionally, air bubbles would develop, and I just punctured them and filled with a little excess mud. When I had it acceptably flat, I used a concrete finish towel to get it smooth. It can be worked to a very smooth surface, but I didn’t attempt to do that.

For the areas between the formed wedges, I taped plastic sheeting to the wedges on either side to keep the mud from adhering to the finished wedges and to keep them clean.

Do Something With the Leftovers!

Ferns.jpg
AlderLeaves.JPEG
StepStonesMore.jpg

Four cubic feet was just a little more than we needed, so we used metal flashing and clamps to make forms for stepping stones. We added leaves to give them a fun look. I have no idea how they will hold up in the rain and freeze, but I guess we’ll find out.

Let It Cure

FLOORDONE.jpg
Instructable Center.jpg

The photo shows how the newest sections look darker. They get lighter as they cure.

In conclusion, a crew of two old fahts did take a few weeks to accomplish soil cementing a 200 square foot area, but it’s a unique and durable floor. Plus it adds mass to the building to help maintain a comfortable temperature inside. I'm working on my middle piece now and will post an update* when it's done.

*Update: I used sakrete for my center piece, which encloses a map of Oregon and an arrow pointing north, both cut/carved from Douglas fir. The sakrete is still curing and will be a bit lighter when completely dried.